Construction of a new 3000m2 operation depot for Followmont Transport on a greenfield site. This new facility increased the operational capacity of the business in Cairns with a new purpose built facility. The project including a 1000m2 warehouse with tilt slab walls and burnished concrete floor finish for added durability and included a sunken dock loading bay with hydraulic levelling ramps. The office area added a 2 level operation area for staff including office spaces, meeting room, lunch area and amenities. The project was capped with a front carpark, signage and landscaping package that ensured the facility would be well recognised and professional industry leader in the transport and freight market.

Most Recent Projects